Saudi Arabia’s Voluntary Carbon Market Fuels the Shift to a Low-Carbon
Under UAE President’s directives, UAE launches urgent relief response for Ghana flood victims
Combating Desertification and Drought: Qatar a Model in Preserving Natural Resources, Establishing Environmental Stability
UAE allocates US$30 million for emergency humanitarian response in El Obeid, calls for civilian protection, safe humanitarian aid access in Sudan
Amman, Aug. 9 (Petra) — New inter-governorate bus routes connecting
Jerash with Irbid and Irbid with Zarqa are now operational, providing
residents with expanded public transport services as part of the
second phase of the public transport development project.
The new routes, operated by the Land Transport Regulatory Commission
(LTRC), aim to provide citizens with safer, more reliable and
efficient transportation options, facilitate daily commutes, reduce
travel times and improve connectivity between governorates, according
to an LTRC statement released on Sunday.
The LTRC said that the Irbid-Jerash route will operate with 15 buses,
each with a capacity of 50 passengers, while the Irbid-Zarqa route
will be served by 42 Coaster buses. The buses are equipped with
electronic payment and GPS tracking systems, as well as smart
cameras, to facilitate fare payment, monitor trip schedules and
enhance safety and service quality.
The Commission stated that the buses are equipped with advanced
safety and comfort features, as well as electronic tracking and
payment systems that help monitor schedules, maintain service
frequency and enhance the overall passenger experience.
The expansion of the public transport network will continue in the
coming days with the launch of additional routes. The Amman-Ajloun
route is scheduled to begin trial operations on Aug. 16 with 22
minibuses, while the Zarqa-Mafraq and Jerash-Mafraq routes will begin
operations on Aug. 20, using 44 large buses and 11 minibuses,
respectively, the statement added.
The latest expansion follows the launch of the Amman-Tafilah and
Amman-Ma’an routes last week, with the public transport development
project expected to become fully operational by the end of August.
//Petra// AJ