Works Ministry completes traffic modifications on Airport Road

Amman, Aug. 8 (Petra) — The Ministry of Public Works and Housing
completed traffic modifications at the Prince Al Hussein Interchange
on the Airport Road and reopened the new traffic flows to facilitate
access for vehicles coming from the Abdoun Corridor tunnel exit
toward Dahiat Al-Nakheel, Hay Al-Sahaba, and Marj Al-Hamam.

The works involved separating the traffic section coming from the
tunnel exit and Abdoun Corridor into two directions. The first
direction allows vehicles to merge onto the Airport Road, while the
second enables vehicles coming from the Abdoun Corridor to head
directly toward Dahiat Al-Nakheel and Hay Al-Sahaba without entering
the main Airport Road.

The ministry stated that these new modifications aim to ease traffic
congestion on the Airport Road, improve vehicle flow, and streamline
transit for drivers coming from the tunnel and Abdoun Corridor toward
neighboring residential areas.

The ministry called on motorists and road users to exercise caution
and adhere to the newly installed directional signage and traffic
rules at the site to ensure public safety and smooth traffic
movement.

//Petra// AF